Every software proposal is written to win, so it's loud about what it includes and quiet about what it leaves out. That's why quotes for the same brief can look so different, and why the cheapest is the hardest to read. Here are six gaps to check, and a scorecard you can run on any proposal before you recommend one.
Why we wrote this
It's Thursday afternoon and the steering committee meets Monday. Three proposals sit in the shared drive for the same build. The cheapest is less than half the price of the dearest.
You've read all three twice. Each has a confident timeline, a polished case study and a team that sounds senior. No two are structured the same way, so nothing lines up side by side.
Why the price gap is mostly a risk gap
Three vendors quoting the same brief are pricing the same unknowns. The real difference is who carries them. A low quote often assumes the easy version of every unknown, and the hard version comes back later as a change request.
Overruns are the norm at scale, not the exception. McKinsey and the University of Oxford studied more than 5,400 IT projects. Large projects, those over US$15 million, ran 45% over budget on average and delivered 56% less value than predicted.
The six red flags
1. A fixed price with no assumptions
A fixed price is only as firm as the assumptions under it.
- What it looks like: one total and a feature list, with nothing on integrations, data or third parties.
- What good looks like: listed assumptions, each saying what happens to the price if it proves wrong.
2. No acceptance criteria
Without agreed criteria, "done" is whatever the vendor says it is.
-
What it looks like: features described as nouns, like "user dashboard" or "reporting module", with no test of when each is finished.
-
What good looks like: each feature has criteria you could check yourself, and the proposal says who signs off.
3. No named team or location
You're buying people, not a logo. If you can't see who builds it, you can't judge seniority.
-
What it looks like: "a dedicated team of experts" with no roles, names or locations.
-
What good looks like: named leads, the roles on the team, where each person works and how much of their time is yours.
4. Unclear IP or repository ownership
In Australia, contractors generally own the copyright in software they write unless a written agreement assigns it. Silence in a proposal is not a small gap.
- What it looks like: no mention of IP, or code kept in the vendor's account until final payment.
- What good looks like: written assignment of IP to you, and code in a repository you own and can see from day one.
5. Thin testing
Testing is the first thing cut to win on price, and the last gap you notice. DORA's guidance puts it plainly: no one should declare work complete unless automated acceptance tests are passing.
-
What it looks like: a single "QA" line item, or testing scheduled as a phase at the end.
-
What good looks like: automated tests run with every change, plus named acceptance testing with your team.
6. Nothing after launch
Launch is where real users find the problems testing missed.
-
What it looks like: the proposal ends at go-live, with support "available on request".
-
What good looks like: a defined warranty period, a clear defect-versus-change line, and support with response times.
When this level of scrutiny is overkill
Not every job needs a six-point review. A small, low-risk change with a trusted vendor can run on a short quote and a clear email. So can a throwaway prototype that never meets a customer.
If a vendor already maintains your system well, their track record is better evidence than any proposal. Save the scorecard for builds that touch customers, money or regulated data, or code you'll live with for years.
The six-flag scorecard
Score each proposal 0, 1 or 2 per row: missing, vague, or written and specific.
|
Flag
|
Ask the vendor
|
Scores 2 when
|
|---|---|---|
|
Assumptions
|
What did you assume, and what if you're wrong?
|
Assumptions are listed and tied to price
|
|
Acceptance
|
How will we both know a feature is done?
|
Criteria per feature, sign-off named
|
|
Team
|
Who builds this, and where are they?
|
Named leads, roles, locations, time split
|
|
Ownership
|
Who owns the IP and the repository?
|
Written assignment, client-owned repo
|
|
Testing
|
What's tested, when and by whom?
|
Automated tests per change, plus acceptance testing
|
|
After launch
|
What happens in the first 90 days live?
|
Warranty, defect definition, support terms
|
The total matters less than where the zeros sit. In an illustrative fintech comparison, the cheapest proposal scores 7 out of 12, with zeros on assumptions and after launch. The dearest scores 10, but its team row is vague.
Now you have precise questions for each vendor, not a gut feel. Next, send every vendor the combined assumption list and ask them to re-quote against it. The gap usually narrows, and what's left is a real difference in approach.
What makes software prices vary
Prices for the same brief differ for four main reasons. None is a sign of value on its own.
Assumptions
Seniority
Discovery
Testing depth
Score ours the same way
EB Pearls Approach
Score the proposal you have
- Can you list the assumptions behind the price you were quoted?
- Do you know who will build it, and where they work?
- Will you own the code and the repository from day one?
Any "no" is the first question to send that vendor this week.
If the timing didn't work last time, pick a new time here. No need to explain.
Frequently Asked Questions
How do you compare software quotes fairly?
What should a software development proposal include?
Should we choose the cheapest software proposal?
Is a fixed-price software quote safer?
Should we pay for discovery?
How long should a software proposal take to prepare?
What drives the cost of a software project?
Is an offshore development team a red flag?